Water Year Totals
Water Level As Of 1/1/2025:
Sugar Pine Reservoir Is Storing 6,665 Acre Feet Of Water
96% Full
17.76 Inches Below The Spillway
A water year is a 12-month period that extends from October 1st to September 30th. The water year is specified by the calendar year in which it ends.
The average annual rainfall measured at the Water Treatment Plant is 49”